Quote:
Enthusiast_MR said:
Hi - I'm waiting in anticipation for a 997 C2 Sept 05 production
It matter where you are.
Mine, too, was "built" on Sep 5, and was "ONVESL" Sep 12. The ship's name is Seijin if your final port is San Diego. Seijin's first stop was Spain; it's due to arrive in the Port of San Diego at 8 pm on October 1. Unloading should be completed within a day, since the Seijin is scheduled to depart from San Diego on Oct. 2. I've heard, but so far have been unable to validate, that you can watch "your" ship go through the Panama Canal, if you can figure out when it's in the canal.
From port to dealer ranges from three to ten days (for Los Angeles), and whether there's any issues that arise with customs or PPI after the Porsche is off the boat.