LP997:
RC:

New rumor: First batch (before September) for the EU, second batch (after September) for ROW. Both without particulate filter. This rumor came from a supplier, so it may not be accurate.

Does someone in the US or ROW who ordered the 991.2 GT3 RS already a confirmed build date before September?


--

 

RC (Germany) - Rennteam Editor Porsche 991.2 Carrera GTS Cabriolet (2018), Porsche Cayenne S Diesel (2017), Audi R8 V10 Plus (2016), Mini JCW (2015)

 

Heard that by my dealer no cars with the filter. first batch for EU limit September after the car is not homologate for EU. Approximately 60 cars for France and no more cars coming. 

 

 

 

You need to be careful: Similar to the 991.1 GT3 RS, dealers get a certain amount of cars and then a second batch could come (991.1 GT3 RS). So far, the distribution of quotas is only valid until the factory summer vacation, afterwards additional quotas will be available (if there will be cars with particulate filter). So if the dealer tells you no more cars after the summer vacation, he is not correct because he doesn't know (unless he knows that there won't be cars with particulate filter but my dealer said he has no information yet).


--

 

RC (Germany) - Rennteam Editor Porsche 991.2 Carrera GTS Cabriolet (2018), Porsche Cayenne S Diesel (2017), Audi R8 V10 Plus (2016), Mini JCW (2015)