Spoke to my OPC on Monday. I'm a little confused to be honest. He looked on the system and my car was not or had not been provided with a date (should be a March Build), however he said he would need to speak with Porsche GB and come back to me. I understand he did and got a date in April of the 16th when the car would be built. He then said a week for delivery and the PDI.

On the basis it takes about 10 days to build (so I've read on this forum somewhere) do I have an April build? As it happens it's no great shakes as I still have to get rid of the TT.